Pitch BNR entrepreneurial program on Asbeter's growth ambitions and financing

DEFINITIVE SOLUTION
27/08/2023

Nice to join BNR's studio on August 25 in an entrepreneurial program about startups and financing their growth ambitions. Listen to the interview below (sorry, only Dutch), with presenter Thomas van Zijl and judge Peter van Meersbergen.

The importance of our AC Minerals technology and the revenue model for investors quickly becomes clear in this pitch. It is striking that here too the role of the government as a stakeholder is directly assigned to FID in the current phase. It is reassuring that Asbeter meets the conditions for a dumping ban on asbestos cement in the Netherlands. In addition, Asbeter has developed a sound logistics concept for the government with the asbestos sector, entirely in line with the advisory report that the Ministry of Infrastructure and Water Management had already commissioned in 2018. Together with public and private parties, Asbeter's AC Minerals flagship plant can be operational in Moerdijk by the end of 2025.

We are now inviting small and large investors who want to make a real impact and at the same time realize a nice, stable return for: 200x10,000=40x50,000=20x100,000=10x200,000=5x400,000=2x1,000,000=1x2. 000,000 in shares, certificates or loans (SAFE) to double the budget for engineering and FID of the circular AC Minerals factory in Moerdijk by applying for a subsidy.

Contact
Inez Postema, CEO: inezpostema@asbeter.com
Jos Hofs, CFO, joshofs@asbeter.com
Zebra Legal, advisors Bastiaan de Wit bastiaan.de.wit@zebralegal.com or Ralph Winkelmolen ralph.winkelmolen@zebralegal.com